COLORADO CUSTOM MANUFACTURING

Steel framing & CFS kits

Cold-formed steel framing for tiny homes and modular building projects. Coordinate drawings, chassis and floor before requesting a kit quote.

Bring the floor plan, wall heights, openings and roof layout. Trailer Made can scope in-house cold-formed steel framing with a trailer foundation and insulated subfloor, or review a separate frame-kit request.

Plan the complete structure

Confirm wall and roof loads, connection details, openings and the applicable design requirements. Engineering and local approvals are defined for the project.

Choose a coordinated package

A chassis, insulated floor and framing package can be reviewed together. A frame-kit quote identifies supplied members, connection requirements and assembly responsibilities.

Confirm price and schedule

Kits generally take about 2–3 weeks; the written quote confirms the production slot, engineering needs, freight and exact included scope.

Define the scope before the price.

Quotes are generally valid for 10 business days. Request current pricing, included scope and written warranty terms for your project.

Request steel framing pricing